Project Details

previous arrow
next arrow
ArrowArrow
Slider

Description

Complex redesign and refurbishment of not only the exsisting lead but also of the original wood roll substrate of the Grade II listed building which was replaced with timber. This project was used as a point of reference for technical expertise within a case study produced by ALM.